Photo album: construction, Step by step the 

April 2003  starting from scratch.

The boat began to being built in Barranquilla – Colombia over one unsheltered area next to the Magdalena River and surrounded by some old and some scrap tug boats who in old days they made the river one important mean of transport from the Caribbean sea to the Colombian’s inland.

August 2009 In progress !!!

Barranquilla is one of the most important Colombian ports located over the Magdalena River entrance.

The sail boat is planed to be used as cruising boat and i will live on board, therefore the material and equipments reliability used in the construction must be priority.

Always thinking  "SAFETY FIRST " 

 (The photos are chronological organized) 

Starting Project  April 2003
Making wooden frames May 2003
Assembling  frames Jun 2003
The hull  July 2003
The Hull being turning over August 2003
Sand Blasting & Painting October 2003
Various photos  2003
March 2004 Photos after hull being applied the first primer coat 

August 2004  Transporting the hull throughout Barranquilla streets.  

Making Windows   Windows being done in Pasto city - Colombia (Nov 2004)

Augusto  2005  Installing the top and side Windows. Wheel rudder system, etc.

January , Jun, November  2006   Forward Pulpit, Fresh water tanks, termal  insulation, Start interior wooden works, Auxiliary engine, Generator.
January 2007: Installing engine, Generator set and more...
2008 - 2009: Engine room, Exhaust system, Row inlet water filter, Personal photos.
July- 2009: Generator exhaust system, Electro Scan ( sanitary treatment system), Cooling water hose connections, Preparing the hull for final top paint.
August-2010: Companion way photos.